The Levi Residence
Navigation

Why Choose Us? 
1. Customers come first.
2. We do what we say we're going to do, within an agreed timeframe.
3. Your satisfaction is  guaranteed.
Kenneth R. Schroeder
The Levi home is just over 5000 square feet under the roof and I took this job as a subcontractor.  I was responsible for drying in the whole house which includes framing, roofing, wall sheeting and siding, and installation of exterior windows and doors.  Later, I was called back to install the wood and Saltillo tile floors.  This house was particularly rewarding because of the challenges involved.  All framing of this house was completely site fabricated out of welded steel members and included features such as cantilevered porch roofs, skylights, and vaulted and coffered ceilings.

I have over 100 floor plans that were drawn with steel framing in mind, but almost any plan can be converted to work with steel.
Framing with steel allows much more design flexibility than wood because of its inherent strength advantages.
 Yes!
It is easy to hang pictures on your steel framed walls.  Simply drive a screw into the stud instead of a nail.